Laying tile can be a tedious task, but it can go smoothly if a person takes the time to properly plan and prepare the design. One of the most convenient things about laying your own tile, is that is less expensive than hiring a professional contractor if the carefully executed.
Materials needed:
Hammer, measuring tape, chalk, chalk line, tile cement, scraper, and grout.
Preparation:
When preparing the foundation, you will need a cleaning solution that is capable of removing dirt, grime, and wax from the base of the floor. Please make sure that the sure that the solution is environmentally safe, and do not mix various chemicals together.
Be sure to check for raised nails or sharp objects because they will need to be hammered down or removed in order to produce a smooth surface as the tiles are being laid. Note If the base floor is in bad shape, it is a good idea to apply plywood over the surface.
Getting started:
If you will be laying an entire room with tile, the first step is to use a measuring tape to find the center of the floor, then mark the center with a piece of chalk. The center will be used as the guideline for tile placement, so you will need to set up the chalkline to make perpendicular lines. This is done by snapping chalk lines from opposite walls
Please look at the example of perpendicular line below:*
Testing the layout:
Before the tile is permanently placed on the floor, start from the center and begin placing the tile into the desired design. It is recommended to use tile spacers for a more accurate layout.
Make the proper adjustments by using a tile cutter to shape and fit the tiles properly against any borders are edges. After every thing has been properly measured, clear up all the tiles, and spread the cement on the areas where the tiles will be placed.
Finish:
- Once the cement has been applied, start laying the tile into the desired design. Finish up by grouting the tile, and removing the excess with a sponge and warm water.