How To Build an Inground Pool

The idea of building your own inground pool can be daunting. Indeed, it is a large task. There are two types of inground pools - fiberglass and gunite. Fiberglass pools are preconstructed and placed into a hole in the ground. Gunite pools require more work. But if you have access to the materials and resources that you need, as well as time to invest into construction, you can build your own inground pool.


  1. Prepare for construction. Prior to beginning to dig out the hole for your pool, contact your municipality to obtain any necessary construction permits. You also need to contact your local utility companies to obtain information about underground piping and utilities.

  2. Choose your pool design. Decide what size pool you want and what shape you would like it to be. Decide whether you want to purchase a fiberglass pool or build your own gunite pool. Using stakes and colored tape, map out the location, size and shape of the pool on its building site. This allows you to view the pool in relation to your house, driveway and other structures on your property. 

  3. Contact the necessary professionals. Call a professional excavator. They can assist you in the layout of your pool and can dig the hole for you. If there are any issues with ground stability or run off, they will be able to help. Next, it is necessary for you to contact a plumber to address any waterfalls, jacuzzi jets or other water features that you wish to have in your pool. If you intend to place lights or electricty in and around your pool, you need to contact an electrician as well. Lastly, you need to call a professional steel worker to line your pool hole with rebar prior to installing your gunite or fiberglass pool.

  4. Complete the construction inspection.  Contact your municipality and request that they send out a building inspector to review the work that has been completed so far.

  5. Install your pool.  This step varies based on the type of pool you have choosen. If you have decided to purchase a fiberglass pool, the pool company will now come and install your pool. If you have elected to install a gunite pool, you will need to call a gunite installation company. They spray your pool foundation with a sand, water and cement mixture. They also create any seats or steps that you have included in your design. It takes two weeks for the gunite to cure.

  6. Complete the tile and deck installation. During the two week period while you wait for your gunite to cure, you can begin installing pool tiles around the ledge of your pool. You can install and grout these tiles yourself, or hire a professional to do it on your behalf. If you wish to install a pool deck, now is the time to complete construction of your deck.

  7. Complete another construction inspection.  Again, your municipality will send out an inspector to review your work thus far.

  8. Have your pool plastered.  Contact a building plasterer to do this for you.  You can choose what color plaster you use on your pool. It takes approximately one week for the plaster to cure.

  9. Fill your pool and enjoy!  Contact a swimming pool maintanence company. They can assist you in the proper balance of chemicals required to maintain a clean and healthy pool, as well as assit you in filling your pool. After your pool is filled and balanced, it is ready for you and your family to enjoy.