Roofing felt, also called tarpaper, is the thin protective layer of material installed between the roof's wooden sheathing and the shingles. It comes in rolls of asphalt-embedded paper. While laying felt is the quickest and easiest part of installing a roof, when done improperly problems can develop such as mold or unattractive uneven shingles.
- Preparation is critical to a quality installation. Sweep the roof sheathing (usually plywood particle board) of any debris. Loose or uneven nails should be removed as well as any splintering flakes in the sheathing.
- Never install the felt over damp sheathing. If rain is in the forecast before the job can be completed, postpone it until the roof is dry. Laying the felt down over damp sheathing is an invitation to mold and rot.
- The felt comes in rolls designated fifteen pounds and thirty pounds. The fifteen pound felt is most commonly used except in northern climates exposed to long periods of severe weather. Begin by unrolling the felt in a straight line along the bottom edge of the roof, smoothing it flat and nailing as you walk it to the other side. Allow six inches of the felt to hang over the edge at each side. This will be trimmed off later.
- The second layer of the roll, and each thereafter, must overlap the previous layer by three to four inches. Continue the process up to the peak of the roof, and then do the same operation on the other side. When both sides reach the peak, fold a piece felt evenly over each side and overlap it six inches. Valleys in the roof should also be covered with a separate strip laid evenly down the middle of the valley with a six inch overlap.
- Trim off all overhanging pieces of felt with a utility knife.