Techniques on Basement Construction
A basement must be constructed to hold up the rest of the house. In addition it has to withstand pressure from both the ground and water forces pressing against it constantly. Understanding this is essential when building a basement. Proper methods of draining and strengthening basement walls are a must.
Concrete Blocks
The most common type of walls for basements is concrete blocks. They must be laid on a footer to keep them from sinking into the ground underneath. These blocks have two holes in them that will be filled with cement and strengthened with rebar metal rods to further enhance the sturdiness of the wall. Once the wall is erected and has been up for a couple of weeks a sealant and a fabric membrane will be applied to keep moisture from seeping in from the outside. It will typically take from one week to one month to complete a concrete block basement wall. This is one of the cheapest walls to build and one of the most efficient.
Solid Concrete
Basement foundations in all of these walls being mentioned are usually set on a concrete footer. It is the very best way to keep the wall from settling and eventually cracking or failing from outside pressures. Solid concrete walls are no exception. It should be set upon a wide concrete footer as well. Usually the walls are poured into a form made of metal or wood and may have designs imprinted on the insides, which will be transferred to the concrete as it dries. As with the concrete blocks rebar is also used for strengthening purposes and structural integrity. Of all the basement walls these walls are the strongest. They also have the advantage of being completely sealed after the forms are removed because they are solid with no seams of any kind. They may have a sealant applied to help with curing.
Wood Foundations
Typically a wood foundation will be set on a bed of gravel. The gravel will provide a drainage system to keep the wood from setting in water. Normally two-by-eight or two-by ten boards are used and nailed into place on 16-inch centers as with a normal stud wall for upper floor framing situations. Then ¾-inch plywood is secured to the studs. All of the wood must be made from green pressure treated lumber. Once done the wall is set on the gravel bed that will help to stabilize the wall. After setting the wall concrete is poured in-between the wood locking it all together. A sealant must be applied in order to prevent any water seepage. One advantage of this system is that it can normally be done within one week or less.