Checklist for Installing Concrete Pavers
It is very cost effective to install concrete pavers to beautify your patio, driveway or walkway. A lot of patience, determination, energy and time is required to complete the installation of the concrete pavers. The key to a successful installation is to be organized and a checklist helps with the organization process.
- Time - At least two days or more to lay out, excavate and lay pavers.
- Tools - Round nose shovel, rototiller, spade, garden rake, lumber, small sledgehammer, power tamper, rubber mallet, brick set, soft broom, garden hose, carpenter's pencil, wet saw, gloves, wheelbarrow, tape measure, level and plate compacter.
- Skills - Cutting stone and laying stone, and laying out square lines.
- Prepare site - Investigate the area that is used. Make sure that there are no utility lines buried in the area. You need to dig at least four to eight inches deep to allow for base material, sand and concrete pavers.
- Materials - Pavers, bedding sand, mason's sand, gravel and landscape fabric.
- Base Preparation - The prefered base material is crushed stones; spread at least three inches thick and compact them together.
- Apply an inch of sand and compact it, leveling out the area.
- Apply the paving stones on the bed of sand in the pattern that you have chosen.
- Fill in the joints with sand. The sand interlocks the paving stones and restrains the pavers around the edges of the perimeter to keep them in place. Compact the pavers with a vibrating plate compacter.
- Hose down the paving stones with a garden hose, washing away loose sand. The dust and dirt settles into the joints and becomes naturally sealed.
- Allow two to three days for the stones to dry before sealing the concrete paving stones.