Checklist of a Concrete Work
Concrete is a heavy material with a coarse texture created from cement, gravel, sand, broken stone and water. The material can be spread or poured to form driveways, sidewalks, floors and countertops. As concrete ages, the material becomes stronger. Proper curing and mild temperatures are required to increase the strength and durability of concrete. A checklist for preparing concrete for floors may prove beneficial for the do-it-yourselfer.
Concrete Floor Checklist
- Obtain a copy of a builder guideline booklet to assure the construction process meets proper codes for the area.
- Validate construction plans with original dates and revision dates.
- Substantiate the plans for the crawl space’s inside fill, bracing requirements and floor thickness.
- The concrete floor should start with a clean 4-inch base.
- A vapor retardant under floor pour should be installed according to local codes.
- Form a screed board by fastening a lath at the desired height of the concrete floor.
- Before pouring the concrete floor, slap connectors should be bent in a downward position.
- Maintain a minimum 2-inch contact between the concrete floor and the base of the wall.
- The concrete floor should have a minimum thickness of 3 1/2 inches.
Raised Concrete Floor
- Cut and remove foam insulation.
- Cut and remove the interior stud facing for a raised concrete floor.
- Obtain a copy of a builder guideline booklet to assure the construction process meets proper codes for the area.
- Validate construction plans with original dates and revision dates.
- Substantiate the plans for the crawl space’s inside fill, bracing requirements and floor thickness.
- The concrete floor should start with a clean 4-inch base.
- A vapor retardant under floor pour should be installed according to local codes.
- Form a screed board by fastening a lath at the desired height of the concrete floor.
- Before pouring the concrete floor, slap connectors should be bent in a downward position.
- Maintain a minimum 2-inch contact between the concrete floor and the base of the wall.
- The concrete floor should have a minimum thickness of 3 1/2 inches.
Checklist for Ready-Mixed Concrete
- Obtain the contact information for the contractor(s) including name, address, telephone number and e-mail address.
- Confirm placement location for slabs, walls and footing.
- Determine the type and size of pump required and if a vertical or horizontal pump will be utilized.
- Decide on the type of grouting agent to be utilized and slick pack.
- Check plans for size of aggregate, density, fibers and special requirements.
- Follow safety procedures including checking power lines around the set-up area and area of concrete installation.